| 1. | Drydock World | | Drydock World Shipyard | MV Western Star | Complete Upgrading of HVAC systen including re-design, re-route of ductwork distribution & installation of
supplied equipment. |
2010 |
| 2. |
Keppel Shipyard (Gul) |
|
Keppel Shipyard (Gul) |
MV Bully 1 |
Supply & Install A60 Insulation works for Engine Room & Machinery Space. |
2010 |
| 3. |
Keppel Shipyard (Tuas) |
SBM |
Keppel Shipyard (Tuas) |
FPSO ''OKHA' |
Complete Upgrading of Engine Room & Pump Room Ventilation systen including re-design, re-route of ductwork distribution & installation of supplied equipment. |
2010 |
| 4. |
Keppel Shipyard (Benoi) |
NorCE |
Keppel Shipyard (Benoi) |
DLB NorCE Endeavour |
Complete Upgrading of Accommodation & Machinery Space HVAC systen including re-design, re-route of ductwork distribution & installation of supplied equipment. Complete Upgrading of ccommodation Cold Room systen including
re-design, re-route of pipework & supply of equipment. |
2010 |
| 5. |
Kreuz Shipbuilding |
Swiber Offshore |
Kreuz Shipyard |
DLB Aziz |
Complete Upgrading of HVAC systen including re-design, re-route of ductwork distribution & installation of supplied equipment.
|
2010 |
| 6. |
Sembawang Shipyard |
|
Sembawang Shipyard |
FDPSO 'Dynamic Producer' |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment. |
2009 |
| 7. |
Sembawang Shipyard |
Polar |
Sembawang Shipyard |
Polar Adventure |
Complete Upgrading of Ventilation systen including re-design, re-route of ductwork distribution & supply of equipment. |
2009 |
| 8. |
Sembawang Shipyard |
Swiber Offshore |
Sembawang Shipyard |
LNG Northwest Sanderling |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment.
Complete Upgrading of accommodation Cold Room systen including re-design, re-route of pipework & supply of equipment. |
2009 |
| 9. |
Aban Pearl Pte Ltd |
Aban Pearl Pte Ltd |
Sembawang Shipyard |
Aban Ice |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment.
Complete Upgrading of accommodation Cold Room systen including re-design, re-route of pipework & supply of equipment. |
2009 |
| 10. |
Kreuz Shipbuilding |
PB |
Kreuz Shipyard |
MV PB Provider |
Complete Upgrading of HVAC systen including re-design, re-route of ductwork distribution & installation of supplied equipment. |
2009 |
| 11. |
Kreuz Shipbuilding |
Swiber Offshore |
Kreuz Shipyard |
MV Swiber Concord |
Complete Upgrading of Engine Room Ventilation systen including re-design, re-route of ductwork distribution & installation of supplied equipment. |
2009 |
| 12. |
Keppel Shipyard (Benoi) |
M3 |
Keppel Shipyard (Benoi) |
M3 Susanne |
Complete Upgrading of Turret Ventilation systen including re-design, re-route of ductwork distribution & installation of supplied equipment. |
2009 |
| 13. |
Keppel Shipyard (Tuas) |
Maersk Contractor |
Keppel Shipyard (Tuas) |
FPSO ' Peregrino' |
Complete Upgrading of Turret Ventilation systen including re-design, re-route of ductwork distribution & supply of equipment. |
2009 |
| 14. |
Keppel Shipyard (Tuas) |
Maersk Contractor |
Keppel Shipyard (Tuas) |
Derrick Barge 'DB 30' |
Complete Upgrading of Existing & New Accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment. |
2009 |
| 15. |
Neptune Marine Oil & Gas Ltd |
Neptune Marine Oil & Gas Ltd |
Sembawang Shipyard |
Offshore Drilling Vesssel 'Neptune Explorer' |
Complete Upgrading of HVAC systen including re-design, re-route of ductwork distribution & supply of equipment. |
2009 |
| 16. |
Keppel Shipyard (Tuas) |
BW Offshore |
Keppel Shipyard (Tuas) |
FPSO 'BW Pioneer' |
Complete Upgrading of Turret Ventilation systen including re-design, re-route of ductwork distribution & installation of Owner supplied equipment. |
2008 |
| 17. |
SMOE |
CPOC |
SMOE |
CPOC JDA B17 Development Platform |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & installation of Owner supplied equipment. |
2008 |
| 18. |
Keppel Fels |
Maersk Contractor |
Keppel Fels |
B280 Submersible Rig |
Complete Electrical works, Duct insulation & Commissioning for HVAC System |
2008 |
| 19. |
EMS Ship Supply |
|
Luwuk Yard, Indonesia |
MV Raisis |
Design, fabricate, assemb le and install of one (1) unit 80 tonR Sea Water Cooled Condensing Unit c/w piping works for Accommodation Airconditioning System |
2008 |
| 20. |
Sembawang Shipyard |
Equinox Offshore Accommodation Ltd |
Sembawang Shipyard |
Equinox ARV 1 |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment.
Complete Upgrading of accommodation Cold Room systen including re-design, re-route of pipework & supply of equipment. |
2008 |
| 21. |
Keppel Fels |
Maersk Contractor |
Keppel Fels |
B295 Submersible Rig |
Complete Upgrading of accommodation HVAC & Refrigeration systen including re-design, re-route of ductwork distribution & installation of DES supplied equipment. |
2008 |
| 22. |
Aban Pearl Pte Ltd |
Aban Pearl |
Keppel Fels |
Aban Pearl Semi Submersible Drilling Rig |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment.
Complete Upgrading of accommodation Cold Room systen including re-design, re-route of dpipework & supply of equipment. |
2008 |
| 23. |
Aibel Ltd
Novenco Ltd |
Bluewater Energy Services BV |
Sembawang Shipyard |
FPSO 'AOKA MIZU' |
Clearing all the punchlist and commissioning of the AC system |
2008 |
| 24. |
Keppel Shipyard (Tuas) |
Seadrill Offshore Singapore P L |
Keppel Shipyard (Tuas) |
Robray T4 Rig |
Relocate and conversion of the main AC Unit c/w Commissioning |
2008 |
| 25. |
Keppel Shipyard (Benoi) |
Thome |
Keppel Shipyard (Benoi) |
FSRU Golar Spirit |
Design, fabricate, assemb le and install of air cooled air conditioning system c/w ductwork for LER & HV room. |
2008 |
| 26. |
Keppel Fels |
Maersk Contractor |
Keppel Fels |
B275 Jack Up Rig |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & installation of DES supplied equipment. |
2007 |
| 27. |
Keppel Shipyard (Tuas) |
SBM |
Keppel Shipyard (Tuas) |
FPSO 'SAXI BATUQUE' |
Design & build the the dehumidifier system . |
2007 |
| 28. |
Sembawang Shipyard |
Bluewater Energy Services BV |
Sembawang Shipyard |
FPSO 'AOKA MIZU' |
Fabrication & Installation of SS316L round ductwork c/w SS316L jacketing on piperack.
Fabrication & Installation of Mild steel round pipe on top of pump room. |
2007 |
| 29. |
MODEC |
MODEC |
MODEC |
FPSO 'TSJOC Truong Son' |
Supply of ventilation fans and fire dampers |
2007 |
| 30. |
Keppel Shipyard (Tuas) |
Maersk Contractor |
Keppel Shipyard (Tuas) |
FPSO 'VINCENT' |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & installation of DES supplied equipment.
Modify, supply & install Ex-proof Air Cooled Package Unit for M85 Top Side Module |
2007 |
| 31. |
Keppel Shipyard (Tuas) |
SBM |
Keppel Shipyard (Tuas) |
FPSO 'MONDO' |
Design & build the the dehumidifiersystem . |
2007 |
| 32. |
BW Offshore |
BW Offshore |
Sembawang Shipyard |
FPSO 'BW PEACE' |
Design, fabricate, assemb le and supply of one (1) unit 13 tonR sea water cooled air conditioning system c/w heater for accommodation and mechanical ventilation system for machinery space. |
2007 |
| 33. |
Tripower Corporation |
Big G |
Subic Bay, Phillipines |
Pressure craft conversion |
Design, fabricate, assemb le and install of one (1) unit 35 tonR and 9 tonR air cooled air conditioning system c/w ductwork for wheelhouse and gym room. |
2007 |
| 34. |
PGS Asia Pacific |
PGS Asia Pacific |
ST Marine (Benoi) & Loyang Offshore |
Nordic Explorer |
Fabrication & Installation of Chill watrer pipes and cooler for the acccommodation chilled water system. Design, supply and intall the AC package unit for ECR Room |
2007 |
| 35. |
Sembawang Shipyard |
Aban Abraham |
Sembawang Shipyard, Singapore |
Offshore Drilling Ship |
Design & build cold room refrigeration plant, insulation wall panel and electrical control panel |
2007 |
| 36. |
ST Marine |
Mv Aquila Explorer |
ST Marine, Singapore |
Seismic Vessel |
Design & build compressor ventilation system c/w control panel, Supply & install ductwork, fire damper, insulation, and instrumentation |
2007 |
| 37. |
Wujiazui Shipbuilding Co., Ltd , Nanjing |
Komrowski, Germany |
|
1080TEU Container Vessels ( 8 + 4 ships ) |
Total supply and commissioning of Air conditioning, Provision Refrigeration and Accommodation ventilation System for 8 + 4 shipsets of 1080TEU Container Vessels |
2007 |
| 38. |
Wu Zhou Shipbuilding Industry Co. Ltd |
I. M. Skaugen Norway |
|
10000M3 Multi-gas LPG/Ethylene/LNG Carriers (6+4ships) |
Design, fabrication, supply and commissioning of Air conditioning and Provision Refrigeration System for 6 + 4 shipsets of 10000M3 Multi-gas LPG/Ethylene/LNG Carriers |
2007 |
| 39. |
Greenland Framnaes |
BW Offshore |
Sembawang Shipyard Singapore |
Y'uum K'ak N'aab Hamilton FPSO Top side Module M45 & M60 |
Supply &install acoustic insulation work for Process line, pipe works, Electrical works and PA System, Tubing works, fabrication & install copper nickel pipe line, fire line valves, supply &install equipments and instruments |
2006 |
| 40. |
Vetco Aibel Ltd. Thailand |
Maersk Contractor |
Thailand |
Power house Module |
Fabrication & Installation of Ductworks to meet NORSOK requirements |
2006 |
| 41. |
Wujiazui Shipbuilding Co., Ltd , Nanjing |
Canada Seaspan Group |
|
900TEU Container Vessels (4 + 4 ships) |
Design, fabrication, supply and commissioning of Air conditioning and Provision Refrigeration System for 4 + 4 shipsets of 900TEU Container Vessels |
2006 |
| 42. |
Stena Drlling, UK |
Stena Drilling UK |
|
STENA CLYDE-Semi-Sub Rig |
Design, fabricate & assemble 2 sets split air-cooled 75 ton R, R407c refrigerant ACCU with 100% redundancy. AHU in G.I double skin casing with 25mm foam rubber insulation. Complete semi-PLC electric control panel integrated with OMRON CX-One PLC software |
2005 |
| 43. |
Sea Trucks, Nigeria |
Sea Trucks, Nigeria |
|
"JASCON 8" -Pipe Lay Barge |
Turnkey including design, fabrication, supply, installation & commisioning of air-conditioning & Mechanical ventilation systems for the 190-men accomodation block |
2005 |
| 44. |
Hitec- Framnaes AS, Norway |
Conoco Phillips |
Corocoro Field, Venezuela |
FSO |
Turnkey including design, fabrication, supply, installation & commisioning two (2) units 18-tonR, ex-proof air cooled air conditioning & Mechanical ventilation systems compliance to Class I, Div II, Group D, T3 for the topside Water-treatment module |
2004 |
| 45. |
Engineering Marine Services |
MODEC |
Victoria Coast |
FPSO "NINA" |
Turnkey including design, fabrication, supply, installation & commisioning two (2) units 72-tonR, ex-proof air cooled air conditioning & Mechanical ventilation systems compliance to Class I, Div II, Group D, T3 for the topside E-house module |
2004 |
| 46. |
Chevron Texaco Thailand |
COTL |
MFP IIB Platforms |
Wellhead platform M8 M11, M12, M13 & M14 |
Turnkey design, fabricate, assemble and supply of Ten (10) units 3 ton R, ex-proof (Indoor & outdoor) air-cooled air- conditioning system compliance to Class I, Div I, Group D, T3 for Control Room |
2004 |
| 47. |
Santa- Fe (Safemal Drilling) |
Safemal Drilling |
West Malaysia |
Rig #134 |
Complete PTI/ PMS services on HVAC, SCR AC and refrigerating Systems |
2004 |
| 48. |
Chevron Texaco Thailand |
COTL |
MFP II A Platforms |
Wellhead platform M7, M9 &M10 |
Turnkey design, fabricate, assemble and supply of Six (6) units 3 Ton R, Ex-proof (indoor & outdoor) air cooled air conditioning system compliance to Class I, Divi II, Group D, T3 for Control Room |
2003 |
| 49. |
Dyna-Mac Engineering Services Pte. Ltd |
SBM Monaco |
Malim Sol Field |
Topside module Battery Room for FPSO "MALIM SOL" |
Design, fabricate, assemble and supply of One (1) unit 2 ton R, ex-proof (indoor & outdoor) air cooled air-conditioning system compliance to Class I, Div. II, Group D, T3 |
2003 |
| 50. |
Dyna-Mac Engineering
Services Pte. Ltd |
SBM Monaco |
Saudi Arabia |
Topside module LER for FPSO "ATLANTIC XIKOMBA" |
Design, fabricate, assemble and supply of Two (2) unit 60 ton R, ex-proof (indoor & outdoor) air cooled package air-conditioning system compliance to Class I, Div. II, Group D, T3 |
2003 |
| 51. |
Dyna-Mac Engineering
Services Pte. Ltd |
SBM Monaco |
Saudi Arabia |
Topside module Battery Room for FPSO "FALCON" |
Design, fabricate, assemble and supply of One (1) unit 2 ton R, ex-proof (indoor & outdoor) air cooled air-conditioning system compliance to Class I, Div. II, Group D, T3 |
2003 |
| 52. |
Dyna-Mac Engineering
Services Pte. Ltd |
SBM Monaco |
Saudi Arabia |
Topside module LER for FPSO "FALCON" |
Design, fabricate, assemble and supply of Two (2) units 40 ton R, ex-proof (outdoor) air cooled air-conditioning system compliance to Class I, Div. II, Group D, T3 |
2002 |
| 53. |
Yantai Raffles Shipyard, PRC |
Kline International |
|
67M Supply Vessel (1 unit) |
Turkey design, supply & installation, testing and commissioning of A/C, Mech. Ventilation & Ductworks. |
2002 |
| 54. |
Yantai Raffles Shipyard, PRC |
Smith International |
Black Sea |
Anchor Handling Supply Vessel (2 units) |
Turnkey project including design, fabrication, supply, installation, testing & commissioning of HVAC, Mech. Vent & Refrigeration equipment. |
2002 |
| 55. |
Dalian Heavy Shipbuilding |
COCC, PRC |
Offshore Panyu |
Offshore LQ (2 units) |
Full HVAC design consultancy including preparation of Technical Specification, documents and drawings for tender. |
2002 |
| 56. |
Sembawang Shipyard |
|
Passenger Liner "WORLD DISCOVERER" |
Passenger Liner "WORLD DISCORER" |
Testing & Commissioning of Air-conditioning system including airflow test, report logging, submission and presenting of system to yard |
2002 |
| 57. |
Keppel Shipyard |
SBM Manaco |
|
FPSO "FALCON" |
Full design consultancy on Two (2) units FPSO conversion works on Accommodation air-conditioning, Mechanical vent & Refrigeration systems |
2002 |
| 58. |
Engineering Marine Services |
Pride International |
|
Jack-Up "M500 MARINE DRILLING" |
HVAC consultancy services for Offshore Low / High Voltage Equipment Module |
2002 |
| 59. |
Engineering Marine Services |
Pride International |
|
Jack-Up "M500 MARINE DRILLING" |
HVAC consultancy services for Offshore Control Process Module |
2002 |
| 60. |
Tidewater Marine |
Tidewater Marine |
|
Supply Vessel |
Complete Upgrading of Air-conditioning system for accommodation areas |
2001 |
| 61. |
Tidewater Marine |
Tidewater Marine |
|
Supply Vessel |
Complete Upgrading of Air-conditioning & Refrigeration systems by replacing condensing unit with new coil & re-built casing, and AHU panelling renewal |
2001 |
| 62. |
Total Automation |
SBM Monaco |
Brazil |
FPSO "Brazil" |
Turnkey HVAC system for Turret Equipment Room on FPSO |
2001 |
| 63. |
Pride International |
Marine Drilling |
Miri, East Malaysia |
Jack-Up "M305" PRIDE HAWAII" |
Engineering Design Consultancy for Fresh air Pressurization System in Accommodation areas of Jack-Up Rig. |
2001 |
| 64. |
Integrated Petroleum Services Sdn Bhd |
Stena Drilling |
Kerteh West Malaysia |
Offshore Drilling |
Complete Upgrading of accommodation HVAC systen including re-design, re-route of ductwork distribution & supply of equipment. |
2001 |